    The kitchen is back on hold :-( The countertops are cut, holes are jigsawed for the sink, the taps and the hob,  the lengthy project to seal the wood has started.  Today the plumber was due to make permanent connections for all the pipe work, install the pesky tap and deal with the gas connections.  Having moved in to what was effectively a building site back in mid-July we were really looking forward to being able to cook properly